CMU SDGs

Water discharge guidelines and standards

SDGs:
6 15
Views : 58

         Chiang Mai University (CMU) has water quality standards and guidelines for water discharges, to uphold water quality and protect ecosystems, wildlife and human health, in support of Sustainable Development Goal 15 (Life on Land). The University's target is that treated wastewater leaving CMU must be cleaner than law requires. This has been in force since the CMU Annoucement on Measures for Wastewater Discharge from University Units, issued on 22 August 2017 under the Enhancement and Conservation of National Environment Quality Act B.E.2535(1992).

         What the University must do. CMU treats all wastewater from its campuses before it is released to public water. It keeps daily operating records for its treatment plants and submits a monthly summary report, including effluent test results, to the locol authority by the 15th of each following month, as required by the Ministerial Regulation of 2012 under the Enhancement and Conservation of National Environmental Quality Act.

        What ever faculty and unit must do. Each unit that connects to the central sewer must :

  1. Buildings, dormitories and shop: install screen that remove solid waste water before water enters the sewer.
  2. Laboratories using chemicals: install a neutralisation tank that keeps wastewater at pH 6.5-7.5 before it enters the sewer, and keep toxic chemicals that could kill the treatment plan's microorganisms in separate holding tanks for proper disposal. Discharging these chemicals into the sewer is strictly forbidden.
  3. Canteens, restaurants and markets: separate food scraps fromwastewater, install grease traps at every washing point, and empty them every time wastewater is discharged.
  4. Construction: never build over the central sewer, and consult the Wastewater Treatment Unit before any new project so it does not harm the sewer, the landscape or the environment.
  5. Maintenance and reporting: keep internal drains in good repair and report water use for every activity by the 3rd of each month.

           How wastewater is treated. CMU runs three conventional activeted sludge treatment plants, 24 hours a day:

         

Plant 
Capacity ( Cubic metre per day)
Plant1, Suan Dok
10,000
Plant2, Mae Hia
1,750
Plant3, Choeng Doi
10,000


             The Wasrewater Treatment Unit has three teams: machinery operators who run the plants, a field team that maintains the sewer network, and a laboratory team that tests water quality and shares knowledge with students, schools and public or private organisations.

            Monitoring result in 2025. Treated water from Plant1 (Suan Dok) is tested every month against the Ministry of Natural Resources and Environment's building effluent standard of 28 June 2024 for Type A buildings (higher education institutions with 25,000 cubic metre or more of floor space). From January to December 2025, every result met the standard:

                                                                           

Parameter
Legal limit 
CMU results, Jan-Dec 2025
pH
5.5-9.0
6.17-7.15
BOD
less than equal to 20 mg/l
1.79-5.57 mg/l
Total suspended solids
less than equal to 30 mg/l
3.40-6.71 mg/l
Fat, oil and grease
                   less than equal to 20 mg/l
0.44-1.16 mg/l
Total Kjeldahi nitrogen
less than equal to 35 mg/l
4.85-8.67 mg/l
Total dissolved solids
              less than equal to 1,000 mg/l
238-361 mg/l
Free chlorine
                  less than equal to 1.0 mg/l
0.04-0.28 mg/l
Sulfide
 less than equal to 1.0 mg/l
0.01-0.08 mg/l
Total coliform bacteria
 less than equal to 5,000 MPN/100 ml
1.1-8.4 MPN/100 ml
Fecal coliform bacteria
 less than equal to 1,000 MPN/100 ml
1.18-8.4 MPN/100 ml


         BOD, a key measure of organic pollution, stayed at or below 28% of the legal limit in every month.


Sources

  • Chiang Mai University. Announcement: Measures for Wastewater Discharge from University Uniys, 22 August 2017.
  • CMU Green Office. "Water quality analysis of Wastewater Treatment Plant1(Suan Dok), January-December 2025".
  • CMU Green Office.Attachment 4.2, "Wastewater management".
Address
Chiang Mai University. 239 Huay Kaew Road. Muang District. Chiang Mai. Thailand. 50200
Contact

Phone : +66 5394 1300
Fax : +66 5321 7143

Social